Completed Projects - Hotel & Resort

PROJECT CADANGAN PEMBANGUNAN YANG MENGANDUNGI:- SECTION 1:4 TINGKAT TEMPAT LETAK KERETA BERTINGKAT & 1 TINGKAT TEMPAT LETAK KERETA TERBUKA ATAS PODIUM, 3 ARAS KEDAI (78 UNIT) & KEDAI MAMPU MILIL, 1 ARAS KEDAI PEJABAT (29 UNIT) SECTION 2: 1 BLOK SUITE PERNIAGAAN 12 TINGKAT (206 UNIT) & 1 ARAS KEMUDAHAN SUITE PERNIAGAAN SECTION 3: 1 BLOK PANGSAPURI PERKHIDMATAN 13 TINGKAT (260 UNIT) DI ATAS 6 ARAS TEMPAT LETAK KERETA & 1 ARAS KEMUDAHAN PANGSAPURI PERKHIDMATAN DI PLOT J5, NO.2A JALAN TUKUL BESI 13/41, SEKSYEN 13, 40100 SHAH ALAM, SELANGOR DARUL EHSAN
CLIENT TTDI SENTRALIS SDN BHD
MAIN-CON NAZA ENGINEERING & CONSTRUCTION SDN BHD
CONTRACT AMOUNT RM 7,107,000.00
YEAR COMPLETED 15 MAY 2021 (EOT)

YEAR COMPLETED:

PROJECT:

MAIN-CON:

KITACON SDN BHD

CADANGAN (198 UNIT) PERUMAHAN 'GATED COMMUNITY STRATA' (STRATA BERTANAH) YANG MENGANDUNGI:


A. 130 UNIT RUMAH BERKEMBAR (BACK TO BACK) 2 TINGKAT (48'X80’)

B. 16 UNIT RUMAH BERKEMBAR 2 TINGKAT (48'X90’)

C. 48 UNIT RUMAH BERKEMBAR 2 TINGKAT (38'X90’)

D. 4 UNIT RUMAH BERKEMBAR 2 TINGKAT (67.5'X80’)

E. 3 UNIT PENCAWANG ELEKTRIK PADAT

F. 1 UNIT PUSAT KOMUNITI

G. 1 UNIT PONDOK PENGAWAL



DI ATAS PT 45110, MUKIM TANJONG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN.(FASA 12)

CONTRACT AMOUNT:

TROPICANA AMAN SDN BHD

2 NOVEMBER 2022

RM 5,000,000.00


CILENT:


PROJECT:

PROPOSED CONSTRUCTION AND COMPLETION OF BALANCE OF WORK FOR TELAGA BOUTIQUE HOTEL, AT PANTAI KOK, MUKIM PADANG MAT SIRAT, DAERAH LANGKAWI, KEDAH DARUL AMAN.

CILENT:

BENUA PERDANA SDN BHD


PROJECT:

PROPOSED ALUMINIUM WORKS OF RESIDENTIAL APARTMENTS (THE LAGUNA) LOCATED AT 2000 JALAN KUALA MUDA, MUKIM PADANG MATSIRAT, 07100 LANGKAWI, KEDAH DARUL AMAN.

CILENT:

LAGUNA DEVELOPMENT LANGKAWI SDN BHD

PROJECT CADANGAN PEMBANGUNAN YANG MENGANDUNGI:- SECTION 1:4 TINGKAT TEMPAT LETAK KERETA BERTINGKAT & 1 TINGKAT TEMPAT LETAK KERETA TERBUKA ATAS PODIUM, 3 ARAS KEDAI (78 UNIT) & KEDAI MAMPU MILIL, 1 ARAS KEDAI PEJABAT (29 UNIT) SECTION 2: 1 BLOK SUITE PERNIAGAAN 12 TINGKAT (206 UNIT) & 1 ARAS KEMUDAHAN SUITE PERNIAGAAN SECTION 3: 1 BLOK PANGSAPURI PERKHIDMATAN 13 TINGKAT (260 UNIT) DI ATAS 6 ARAS TEMPAT LETAK KERETA & 1 ARAS KEMUDAHAN PANGSAPURI PERKHIDMATAN DI PLOT J5, NO.2A JALAN TUKUL BESI 13/41, SEKSYEN 13, 40100 SHAH ALAM, SELANGOR DARUL EHSAN
CLIENT TTDI SENTRALIS SDN BHD
MAIN-CON NAZA ENGINEERING & CONSTRUCTION SDN BHD
CONTRACT AMOUNT RM 7,107,000.00
YEAR COMPLETED 15 MAY 2021 (EOT)

YEAR COMPLETED:

PROJECT:

MAIN-CON:

KITACON SDN BHD

CADANGAN (198 UNIT) PERUMAHAN 'GATED COMMUNITY STRATA' (STRATA BERTANAH) YANG MENGANDUNGI:


A. 130 UNIT RUMAH BERKEMBAR (BACK TO BACK) 2 TINGKAT (48'X80’)

B. 16 UNIT RUMAH BERKEMBAR 2 TINGKAT (48'X90’)

C. 48 UNIT RUMAH BERKEMBAR 2 TINGKAT (38'X90’)

D. 4 UNIT RUMAH BERKEMBAR 2 TINGKAT (67.5'X80’)

E. 3 UNIT PENCAWANG ELEKTRIK PADAT

F. 1 UNIT PUSAT KOMUNITI

G. 1 UNIT PONDOK PENGAWAL



DI ATAS PT 45110, MUKIM TANJONG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN.(FASA 12)

CONTRACT AMOUNT:

TROPICANA AMAN SDN BHD

2 NOVEMBER 2022

RM 5,000,000.00


CILENT:


PROJECT:

CADANGAN TAMBAHAN DAN UBAHSUAI HOTEL PERANGINAN SEDIADA (TANJUNG RHU RESORT) YANG MELIPUTI KERJA-KERJA BERIKUT:

TAMBAHAN BANGUNAN BARU:-

-83UNIT VILLA MEWAH

-1 BLOK SATU DAN DUA TINGKAT “BACK OF HOUSE”, GELANGGANG TENIS, BLOK TEMPAT LETAK KERETA, PENCAWANG LETRIK DAN LAIN-LAIN

-SISTEM PEMBENTUNGAN

-PEMASANGAN SISTEM PAIP DAN TANGKI AIR 

DI ATAS LOT 1476 DAN SEBAHAGIAN LOT HS(D) 12/1983, MUKIM AYER HANGAT, DAERAH LANGKAWI, KEDAH DARUL AMAN.

CILENT:

REKA INTISARI SDN BHD